• Boeing's largest plant in 'panic mode' amid safety crisis, say workers

    From useapen@21:1/5 to All on Sun Jun 2 10:03:59 2024
    XPost: alt.fan.rush-limbaugh, rec.aviation.piloting, rec.travel.air
    XPost: sac.politics, talk.politics.guns

    Boeing’s largest factory is in “panic mode”, according to workers and
    union officials, with managers accused of hounding staff to keep quiet
    over quality concerns.

    The US plane maker has been grappling with a safety crisis sparked by a
    cabin panel blowout during a flight in January, and intense scrutiny of
    its production line as regulators launched a string of investigations.

    Related: US justice department could sue Boeing after Max 737 crash
    settlement violation

    Its site at Everett, Washington – hailed as the world’s biggest
    manufacturing building – is at the heart of Boeing’s operation,
    responsible for building planes like the 747 and 767, and fixing the 787 Dreamliner.

    One mechanic at the complex, who has worked for Boeing for more than three decades, has claimed it is “full of” faulty 787 jets that need fixing.

    Many of these jets are flown from Boeing’s site in South Carolina, where
    the company shifted final assembly of the 787 in 2021 in what was
    characterized as a cost-cutting measure.

    “There is no way in God’s green earth I would want to be a pilot in South Carolina flying those from South Carolina to here,” the mechanic, who
    requested anonymity for fear of retaliation, told the Guardian. “Because
    when they get in here, we’re stripping them apart.”

    Managers at Everett “will hound mechanics” to keep quiet about quality- assurance concerns and potential repairs, the mechanic alleged,
    emphasizing speed and efficiency over safety. He added: “Boeing has to
    look in the mirror and say: ‘We’re wrong.’”

    There is no way in God’s green earth I would want to be a pilot in South Carolina flying those [787 jets] to here

    Anonymous Boeing mechanic in Washington

    Boeing did not comment on claims that staff have been pressured not to
    raise concerns about quality. Work at Everett on 787 jets is taking place
    as part of an established verification program, it said.

    The company met this week with US regulators to discuss how it plans to
    address quality-control issues. Executives have recently described how
    workers have been emboldened to speak up since January, with submissions
    to an internal portal for safety and quality concerns up 500%.

    Earlier this year, a panel of experts, which was appointed by the US
    Federal Aviation Administration (FAA) after two fatal Boeing 737 Max
    crashes in 2018 and 2019 that killed 346 people, described a “disconnect” between Boeing’s leadership and workforce on safety, and made 53 recommendations to help resolve its concerns.

    After January’s blowout, which took place on board a brand-new Max 9
    plane, the FAA launched a sweeping investigation. After a six-week audit
    of Boeing’s production line found multiple failures to comply with manufacturing quality-control requirements, the agency gave Boeing 90 days
    to outline an action plan and address the panel’s findings.

    Boeing submitted its proposed plan to the FAA on Thursday. In a statement,
    the company said it “welcomed” the expert panel’s 53 recommendations. Mike Whitaker, the FAA administrator, told reporters that Boeing had accepted
    them all.

    Najmedin Meshkati, who served on the panel, said Boeing’s safety culture
    has “eroded” over the past two decades, in the wake of its merger with McDonnell Douglas in the late 90s, “under the direct watch of its leaders
    and board of directors, who have been complicit in and ultimately
    responsible for its present problems”.

    “Boeing’s most valuable asset is its highly dedicated and skilled
    workforce, and, fortunately, most of its systems-related problems are
    fixable,” Meshkati, professor of civil and environmental engineering at
    the University of Southern California, said in an interview before the
    company presented its plan this week. “However, Boeing’s corporate
    governance and its perpetually cloned [board] needs to be overhauled and diversified,” he added, suggesting that it should move its headquarters
    back to Seattle and “systematically” implement all the panel’s
    recommendations.

    The FAA launched another investigation this month, into production of the
    787 Dreamliner, scrutinizing whether Boeing workers in South Carolina
    completed required inspections on the jet, and whether they “falsified
    aircraft records”, after Boeing informed the watchdog that it “may not
    have completed” all checks.

    Sam Salehpour, an engineer at Boeing, testified in front of Congress in
    April that the 787 was riddled with quality defects and called for all
    787s to be grounded for inspection. Boeing denied his allegations and said
    it was “fully confident in the safety and durability” of the plane.

    The mechanic who spoke to the Guardian described how “giant failures” in Boeing’s 787 production line had put enormous pressure on the company as
    it scrambles to reassure regulators, airlines and passengers.

    “Right now, we’re in panic mode in Everett,” they said, because Boeing
    managers “finally figured out that they got more people that have no idea what’s going on, than people that do”.

    A spokesperson for Boeing said: “As we shared publicly on numerous
    occasions, we will put all undelivered 787s through our join verification program to ensure every airplane conforms to our exacting engineering specifications prior to delivery to our customers. Airplanes assembled
    since 2022 do not require this additional join verification work.

    “In mid-2023, we announced that we would relocate all join verification
    efforts in Everett so that we can focus our South Carolina team on new
    airplane production positions. There has been no change to this plan and
    our team in Everett has continued to complete the join verification
    program.”

    Some workers at Everett have characterized the shift of 787 production
    from Washington to South Carolina as an anti-union move: whereas
    Washington has a union for mechanics, Boeing’s plant in South Carolina is non-union, and was the site of a contentious union-organizing drive
    several years ago.

    The team leader isn’t picked by his skill on the airplane – he’s picked by
    his relationship with another manager

    Anonymous Boeing mechanic

    Another Boeing employee at Everett, who also requested anonymity, drew a contrast between productivity at the Washington state complex and the
    North Charleston factory in South Carolina, where final assembly of the
    787 was moved but where no union mechanics were hired.

    “We would build 10 to 12 planes a month, while South Carolina would build
    just over two, almost three a month,” they said. “I don’t see them ever
    getting to 10 a month.”

    A “very robust union-containment strategy” at Boeing is partly responsible
    for the company’s broader safety problems, said Rich Plunkett, director of strategic development for the Society of Professional Engineering
    Employees in Aerospace (Speea), IFPTE Local 2001, which represents 17,000 employees at Boeing and Boeing supplier Spirit AeroSystems.

    In addition to not hiring union mechanics in South Carolina, Boeing has significantly reduced the number of workers who write instructions for machinists in recent years, through outsourcing, voluntary resignations
    and layoffs.

    “The existing employees are not the enemy,” said Plunkett. “They’re your solution. And you need to engage them collectively.

    “Boeing has to implement meaningful non-retaliation policies, demonstrate
    by walking the talk, and quit threatening their workforce [that] if they
    can’t do everything they can cheaper that they’re going to send the work abroad. Because Boeing’s globalization is continuing, if not expanding, in
    the midst of Boeing telling the free world they’re changing the culture.”

    Some veteran union employees at Boeing draw a link between its current
    issues and a move by the company more than two decades ago to introduce
    “team leader” managers, replacing a previous system whereby the most
    senior, experienced factory workers were in charge.

    “The team leader isn’t picked by his skill on the airplane – he is picked
    by his relationship with another manager or another person,” said the
    mechanic. “Now we don’t have team leads who know what’s up.”

    Today, the managers “doing the thinking have never done physical labor
    before”, they added. “There’s no way you can learn how to build an
    airplane in a school on the third floor. There are a lot of things you can learn in the classroom, but building an airplane is not one of them.”

    Boeing said: “We value experience as well as other factors such as skill
    set, performance and leadership that go into making a strong team lead.
    Our team leads help develop employees while the overall training we
    provide builds the knowledge and skills of our teammates as they advance
    in their Boeing career.”

    Recently, disagreements between Boeing and unions have stalled talks over
    the creation of a program for employees to raise safety concerns to
    regulators without fear of retaliation.

    Speea claimed last month Boeing wanted to control the flow of information
    to regulators; Boeing said it had offered the union the same deal it had
    signed with another union, the International Association of Machinists and Aerospace Workers, and was willing to negotiate.

    Boeing did not comment on the company’s position toward unions, criticism
    tied to the 1997 merger with McDonnell Douglas, or complaints about quality-assurance issues.

    https://finance.yahoo.com/news/boeing-largest-plant-panic-mode-
    100035082.html

    --- SoupGate-Win32 v1.05
    * Origin: fsxNet Usenet Gateway (21:1/5)