    From <https://nltimes.nl/2023/04/07/train-derailment-timeline-leaked-crane-active-railroad-earlier-agreed>:

    "Voorschoten train derailment timeline

    3:23 a.m.: The contractor's on-site safety manager contacts the ProRail
    train traffic controller with the request to briefly put the tracks next
    to the worksite out of service so that the crane can safely cross. The
    train controller replies that this will be possible in 10 minutes. The workplace safety manager gives instructions to wait for a call from the
    train traffic controller. For reasons that are unclear, the crane then
    arrives too early on or close to the track in service and is hit by the
    freight train.

    After the collision with the freight train, the crane ends up on the
    track where the NS passenger train is approaching. This also collides
    with it, causing the NS train to derail.

    3:29 a.m.: The operations control centre for infrastructure (OBI) calls
    the train traffic controller with the report that several overhead lines
    have failed. It is asked whether there is still train traffic between
    The Hague and Leiden.

    3:31 a.m.: The Railroad Control Room calls the train traffic controller
    to ask whether an incident has occurred at Voorschoten. The train
    traffic controller replies that he is not aware of an incident, but that
    he has received a report from the OBI that the overhead line voltage has
    been lost.

    3:31 and 3:32 a.m.: The train traffic controller calls the freight
    train, the passenger train and the train behind the freight train, but
    does not reach any of the drivers.

    3:34 a.m.: The driver of the train behind the freight train calls back
    that the power has been lost just before Mariahoeve.

    3:36 a.m.: The Railroad Control Room contacts the train controller
    again. The control room says that the fire brigade has been informed
    that a crane has been hit and that the NS control room reports that the
    NS train has derailed. Emergency services are dispatched.

    Reporting by ANP"
    --
    Rob
    "I have never understood why it should be necessary to become irrational
    in order to prove that you care, or, indeed, why it should be necessary